• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Rolesville Main Street Project

Rolesville Main Street Project

Creating a safer, more successful, and more attractive Main Street for residents, business owners, and visitors alike.

  • About
    • About This Project
    • Corridor Characteristics
  • History & Purpose
  • News & Updates
  • Resources
  • Contact
  • Facebook
  • Instagram
  • Twitter
  • YouTube

Traffic Transitions from Old Burlington Mills Road to Newly Constructed Burlington Mills Road

December 4, 2025

Beginning Thursday night, traffic will transition from Old Burlington Mills Road to the newly constructed Burlington Mills Road.

What to Expect – Updated Traffic Pattern

To support a smoother, safer flow of travel in this area, several adjustments will go into effect:

  • The left-turn lane from Old Burlington Mills Road onto Main Street will close as part of the new configuration.
  • The traffic signal at Old Burlington Mills Road will operate in flashing-red mode or be replaced with a stop sign for right turns. This intersection will operate as Right-in/Right-out only to promote safer and more predictable movement.
  • Once the new intersection opens, left turns from Main Street onto Burlington Mills Road—and from Burlington Mills Road onto Main Street—will no longer be available.
  • The two existing left-turn lanes from Main Street to Burlington Mills Road will be blocked and eventually removed as the new roadway design takes shape.
  • Traffic will shift north onto the Burlington Mills Road Realignment at the new intersection, where both left and right turns will be available for drivers on Main Street and the realigned roadway.
  • A new connector from the realignment will tie into the existing Burlington Mills Road near Barrington Hall Drive, maintaining convenient access to Barrington Hall Drive, Little One’s Academy, the Rolesville Veterinary Hospital, and nearby homes.

Drivers are encouraged to use surrounding intersections to complete turning movements safely. Please follow posted signs, travel with care, and allow a little extra time while crews finalize work and adjust signal timing.

About the Burlington Mills Road Realignment

The Burlington Mills Road Realignment is an important element of Rolesville’s Main Street Project. By aligning Burlington Mills Road with New Burlington Mills Road, the Town is replacing two offset intersections with one modern, signalized intersection designed to:

  • Create more efficient and intuitive traffic flow
  • Reduce conflict points and enhance safety for everyone on the road
  • Add new sidewalks, crosswalks, and bike lanes to support walking, biking, and other modes of travel
  • Improve neighborhood access and support future development along the Main Street corridor

These enhancements are part of Rolesville’s ongoing commitment to building a safer, more connected, and welcoming community for all.

Project Updates

Primary Sidebar

Get Project Updates

Email alerts through the Rolesville NewsBlast system are the primary means for the Town to communicate with interested members of the community. Expect regular, weekly notices regarding Town events, programs, expected service delays, and other news items.

Sign up for an account or manage your Rolesville NewsBlast settings.

Sign up today

Rolesville Town Hall

Project Hotline:
919-326-7857

Address:
502 Southtown Circle
P.O. Box 250
Rolesville, NC 27571

Email:
mainstreetproject@rolesvillenc.gov

Hours:
M-F Open 8:00 AM – 12:00 PM
M-F Closed 12:00 PM – 2:00 PM
M-F Open 2:00 PM – 5:00 PM

Recent Updates

  • Traffic Transitions from Old Burlington Mills Road to Newly Constructed Burlington Mills Road December 4, 2025
  • Main Street from Perry Street to Williams Street Reopens to Two-Way Traffic September 17, 2025
  • Temporary Closure Planned for Small Section of North Main Street May 28-30 May 28, 2025
  • Updates on the Main & Young Streets Intersection Upgrades February 14, 2025
  • Main & Young Streets Intersection Upgrades Continue February 7, 2025

Get Main Street Project Updates

Email alerts through the Rolesville NewsBlast system are the primary means for the Town to communicate with interested members of the community. Expect regular, weekly notices regarding Town events, programs, expected service delays, and other news items.

Sign Up Today

Footer

Stay Connected

  • Facebook
  • Instagram
  • Twitter
  • YouTube

Project Information

  • Home
  • About
  • History & Purpose
  • News & Updates
  • Resources
  • Contact

Project Contact

Project Hotline:
919-326-7857

Email:
mainstreetproject@rolesvillenc.gov

Copyright © 2025 • Town of Rolesville, NC
Rummel, Klepper and Kahl, LLP (RK&K) operates and hosts this site for the benefit of Rolesville.