Rolesville Project Plans
Download the PDFPedestrian Access and Roadway Detour
Download the PDFRolesville Main Street Project Detour Route
Download the PDFStreetscape Elements Survey Results
Download the PDFMain Street Vision Plan
Funding for the grant project was sought from CAMPO based upon a joint planning effort between CAMPO and the Town to develop the Main Street Vision Plan. This plan divides the 4-mile Main Street corridor into three areas ripe for development. The Town seeks to create a true town center by utilizing urban design practices and building a sense of place.
The Main Street Vision Plan was put together in 2018 and the final designs of town projects may have changed from conception to the design approved for construction.
Download the PDF